MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-18-2015   #10
Mark Leasure
 
Mark Leasure's Avatar
 

Join Date: Aug 2006
Location: eagan
Posts: 898
Re: Mark's 1G Winter Projects

On to the next step. I filled the block yesterday. I ended up going about 1 inch down from the deck surface, I think that's considered a three-quarter fill. It was my first time messing around with block filler. It's not the easiest stuff to work with, since the water holes in the deck only allow you to use a small funnel when filling. And the stuff is messy. Thanks goes out to John for letting me use one of his torque plates. Applying 110 lb/ft to the head studs is weird, it's like tightening lug nuts. The rubber hose allows insurance that there is a water path from the pump. They are easily removed when the block filler is cured. I removed the water pump block off plate after 10 hours and removed some semi cured filler material to insure proper water pump functionality. The next step is to get the block out for line honing the mains.



__________________
Slowest: 2017 Corvette Z06 - Z07 Trim
Fast: EvoIX SE – Blouch 2.0xtr turbo – E85
Faster: Evo IX MR –PTE6266 – E85 –823WHP 9.90@147
Fastest: 92 Talon AWD – 8.14 @ 171 MPH
www.maperformance.com

Last edited by Mark Leasure; 01-18-2015 at 10:48 AM..
Mark Leasure is offline   Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 04:38 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.